Overview

Client Brief: Replace the school’s ageing sports surface with a new, high-performance multi-sport field capable of supporting AFL, soccer, and four square — giving students safe, year-round access to sport and recreation. 

Key Challenges: : Existing surface needed full removal without disrupting a live, operating school. Drainage had to be engineered to handle water across the full 5,000 m² field. A tight 7-week program required careful sequencing across every stage. Delivery had to meet VSBA specifications and sign-off at each stage. Surrounding grounds also needed reinstating once works were complete.

Our Solution: Stripped and removed the existing surface across the site. Built a 300mm crushed rock foundation with a 200mm capping layer. Installed a Mego Flow subsurface drainage system for reliable water management. Added spoon drain perimeter surface drainage around the field.Installed FieldTurf Academy Pro across the full 5,000 m² multi-sport field.Sh aped and hydroseeded 2,500 m² of surrounding areas to complete the site.

Base: Built a 300mm crushed rock foundation with a 200mm capping layer, with a Mega Flow subsurface drainage system

Turf Style: Field Turf Academy Pro

Additional features: Line marked the field for AFL, soccer and four square, creating a true multi-sport space.

Area Size of Job: 5,000 m2

Job Location: Newbury Primary School, Craigieburn, VIC

Have a question for us?

Our friendly team will gladly help you out with any questions you may have. Just fill out the form below and we will be in touch soon.

    Type of Project